Home → Campaign Manager → Form 3X Compliance FAQs → 23.6 How Do I Force the H1 to Pull to the Form 3X
25.7. 23.6 How Do I Force the H1 to Pull to the Form 3X
To force Schedule H1 to pull to an FEC Form 3X, please do the following:
- On the criteria page for the report, simply check the box labeled "Schedule H1 Override". This will force the schedule to pull to the report.
This page was: Helpful |
Not Helpful