Home → 360 → FEC Form 3X Compliance → Data Entry for Schedule H2
42.9. Data Entry for Schedule H2
Data Entry for Schedule H2 in A360
Schedule H2 is for fundraising events and direct candidate support activities. To get your data to pull to this schedule correctly in Aristotle 360 - check the event date duration, and make sure the dates are within the allocation date duration. If your H2 is not pulling the event correctly, make the necessary changes to the date allocation so it fits within the report date range.
For example, an event that would pull correctly to a report date range of 3/1/2016 - 6/31/16, would look something like: 'Sustaining Membership 2016' with a date between 3/2/2016 - 6/30/2016.
This page was: Helpful |
Not Helpful