HomeCampaign ManagerForm 3X Compliance FAQs23.6 How Do I Force the H1 to Pull to the Form 3X

25.7. 23.6 How Do I Force the H1 to Pull to the Form 3X

To force Schedule H1 to pull to an FEC Form 3X, please do the following:

- On the criteria page for the report, simply check the box labeled "Schedule H1 Override". This will force the schedule to pull to the report.

This page was: Helpful | Not Helpful